
|
No. 14 - Young vineyard with the temporary narrow
gauge RR track laid on the sandy soil to convey the grapes to the
winery. Very heavy work. Each section of track needed four men to
lay it down and bolt it together. Mr. Signorio's buggy is also visible
in the photo.
|
University Library Special Collections |