University Drive Crosswalks Improvements

Demolition in progress for sidewalk and ramp at crosswalk near building # 8. Click to Zoom. Traffic Control at University Drive. Click to Zoom. Removal of speed bumps along University Drive. Click to Zoom. One of the twelve existing crosswalk along University Drive to be upgraded. New a/c and ventilation systems will be installed. Click to Zoom.

About This Project

The project upgrades twelve (12) crosswalks locations along University Drive; crosswalks will be perpendicular realigned for a shorter crossing distance, and marked with high visibility striping. The new marking will help to direct pedestrians to the center of the crosswalk; speed bumps will also be removed to improve pedestrian safety.

A high intensity flashing LED beacon and speed feed back sign will be installed at particular locations.

Statistical Information

Construction start date:
Feb 2008
Expected completion date:
April 2008
Construction Cost:
$260,000
Total Project Cost: $251,000
Gross sq. footage:
NA
% of project complete:
30%

Progress of Major Construction Activities

  • Removal of the existing speed bumps is 30% complete
  • Demolition of concrete curb ramps and forming of new crosswalk ramps is 40% complete

Key/Critical Issues Currently Pending

  • NA at this time.

Upcoming Utility or Other Interruptions

  • NA at this time.

Other Areas of Significance

  • NA at this time.