Cal Poly Pomona

November 2008 Updates

University Drive at Mansion Lane

New crosswalk west side of University drive. Click to Zoom. New ramps and crosswalks between Bldg. 94 and Bldg. 9. Click to Zoom. New crosswalk leading to Building 1. Click to Zoom.

About This Project

The southbound right-turn lane from Mansion Lane to University Drive was removed, and the sidewalk reconstructed. To decrease pedestrian crossing distance the diagonal crosswalk from Building 1 to the corner of Building 94 was replaced with a perpendicular crosswalk; all four corners of the intersection are now connected with new crosswalks with highly reflective crosswalk pattern. New more effective signs were installed, including a flashing beacon on each direction of University Drive to give motorists advanced warning of pedestrians on the crosswalks; new and existing cubs were painted indicating no parking zones on side streets.

The speed bump near the intersection was removed, and a new raised crosswalk between Building 1 and the quad area was also installed.

Statistical Information

Construction start date:
June 2008
Expected completion date:
August 2008
Construction Cost:
$230,000
Total Project Cost: $260,000
Gross sq. footage:
NA
% of project complete:
95%

Progress of Major Construction Activities

  • New sidewalks and ramps are completed, pavement of the entire intersection is complete, new signs and pavement stripping are installed.

Key/Critical Issues Currently Pending

  • Installation of a lighted crosswalk warning system will begin on 12/15, and is scheduled to complete by the week of 12/28

Upcoming Utility or Other Interruptions

  • NA at this time.

Other Areas of Significance

  • NA at this time.