Contents
Cal Poly Pomona

August 2008 Updates

University Drive at Mansion Lane

New ramps and crosswalk leading to Building 1. Click to Zoom. A new Flashing Beacon is being installed at the north/east corner of Mansion Lane. Click to Zoom. New Flashing Beacon at new crosswalk. Click to Zoom.

New ramps and crosswalks at north and east corners of Mansion Lane. Click to Zoom. New ramps and crosswalk between Building 94 and Building 9. Click to Zoom. Striping for new crosswalks is being applied (looking west on University Drive). Click to Zoom.

About This Project

The southbound right-turn lane from Mansion Lane to University Drive was removed, and the sidewalk reconstructed. To decrease pedestrian crossing distance the diagonal crosswalk from Building 1 to the corner of Building 94 was replaced with a perpendicular crosswalk; all four corners of the intersection are now connected with new crosswalks with highly reflective crosswalk pattern. New more effective signs were installed, including a flashing beacon on each direction of University Drive to give motorists advanced warning of pedestrians on the crosswalks; new and existing cubs were painted indicating no parking zones on side streets.

The speed bump near the intersection was removed, and a new raised crosswalk between Building 1 and the quad area was also installed.

Statistical Information

Construction start date:
June 2008
Expected completion date:
August 2008
Construction Cost:
$230,000
Total Project Cost: $260,000
Gross sq. footage:
NA
% of project complete:
100%

Progress of Major Construction Activities

  • Pavement of the entire intersection is complete, new signs and pavement stripping are installed.

Key/Critical Issues Currently Pending

  • NA at this time.

Upcoming Utility or Other Interruptions

  • NA at this time.

Other Areas of Significance

  • NA at this time.