November 2008 Updates

Smart Transit Signs

Proposed Sign Location #1 at University Village. Click to Zoom. Proposed Sign Location #2 at Parking Lot B. Click to Zoom. Proposed Sign Location #3 at Building 94. Click to Zoom.
Proposed Sign Location #4 at the CLA Building. Click to Zoom. Proposed Sign Location #1 at University Village. Theoretical Rendering. Click to Zoom. Proposed Sign Location #4 at the CLA Building, Theoretical Rendering. Click to Zoom.

About This Project

Install of four owner supplied smart transit bus signs. These solar powered signs will be mounted on new poles at existing bus stops. They contain LED scrolling marquees and communicate pick-up bus times via a GPS system.

Statistical Information

Construction start date:
Dec. 2008
Expected completion date:
Jan. 2009
Construction Cost:
$40,000
Total Project Cost: $50,000
Gross sq. footage:
N/A
Assignable sq. footage:
N/A
% of project complete:
10%

Progress of Major Construction Activities

  • Signs manufacturing is in process.
  • Preliminary post and footing design is complete.
  • Final layouts are being verified.
  • Budgeting and schedule confirmation in progress.

Key/Critical Issues Currently Pending

  • There is a tight schedule on this project and the project/construction processes are being accelerated as much as possible to accommodate.

Upcoming Utility or Other Interruptions

  • Some minor traffic flow impacts may occur although this work is currently anticipated to take place during the holiday break.

Other Areas of Significance

  • NA at this time.