Contents
Cal Poly Pomona

January 2011 Updates

Innovation Village Ph. IV

View of Building looking south (1/20/11). Click to Zoom. View of the Building's corner looking southwest (1/20/11). Click to Zoom. Second floor HVA/C duct runs. Monokote fireproofing on steel beams, fire sprinklers. (1/20/11).  Click to Zoom.
Installation of decorative roof top over hang canopy, (1/20/11). Click to Zoom. Ceiling framing in vaulted lobby area above main entry. (1/20/11). Click to Zoom. View of 1st. Floor entry lobby. (1/20/11). Click to Zoom.

About This Project

Construction of a new 123,060 SF concrete tilt-up office facility on a 6.7 acre Innovation Village Research Park site. The new three story structure is the second of several facilities master planned for the Research Park to partner with organizations which are aligned with the mission of the University and will promote partnerships within the University’s academic environment as well as provide jobs and economic growth to our surrounding community. This facility is being constructed for the exclusive use by Southern California Edison and is their second facility in the park. Trammell Crow Company in a joint venture with Millie Severson Inc. are the contractor for the facility and the site improvements including the second phase of the Innovation Way extension. Also included in the project will be LEED Gold measures, a new bio-swale storm water drainage system, and site improvements matching those completed in the Phase III site.

Statistical Information

Construction start date:
Dec 2009
Expected completion date:
June 2011
Construction Cost:
$21,323,000
Total Project Cost:
$27,929,000
Gross sq. footage:
123,060
Assignable sq. footage:
110,500
% of project complete:
79%

Project Funding

  • Cal Poly Pomona Foundation Inc.

Progress of Major Construction Activities

  • Interior core wall framing and insulation.
  • HVA/C duct work and insulation.
  • Installation of roof top HVA/C Units and other roof top equipment.
  • Completion of the roof screen structure.
  • Installation of miscellaneous steel work around the buildings perimeter.
  • Completion site landscape irrigation systems.
  • Completion of glazing installation
  • Installation of spandrel glass glazing
  • Installation of elevator raceways and cab platform.
  • Installation of plumbing and electrical interior rough-ins
  • Installation of fire sprinkler piping systems
  • Framing of entry soffits

Key/Critical Issues Currently Pending

  • NA at this time.

Upcoming Utility or Other Interruptions

  • NA at this time.

Other Areas of Significance

  • NA at this time.