Existing concrete road will be continued towards the CBA and Parking lot H. Click to Zoom. Electrical utilities are relocated at the Rose Garden towards installation of  new 8” storm drain pipe.  Click to Zoom. View of Fire Lane road excavation at the Rose Garden location. Click to Zoom.
Cutting of control joints intended to avoid cracking of newly finished  concrete surfaces.  Click to Zoom. View of new Fire Lane extension and new swales. Click to Zoom. Excavation of storm drain line at the Rose Garden.  Click to Zoom.

About This Project

The project is located near the Rose Garden, the CLA building and the southeast corner of the College of Business project site. It includes the construction of an 8” thick reinforced concrete fire lane and ADA pathways. The 650’ L x 25’ W pathway will connect the College of Business Administration with parking Lot H (Red Gum) and the CLA Building comprehensively improving the pedestrian pathways infrastructure on campus. The total project cost is approximately $450,000 and will be implemented during 2010.

Statistical Information

Construction start date:
Jan 2010
Expected completion date:
May 2010
Construction Cost:
$350,000
Total Project Cost:
$450,000
Gross sq. footage:
16,250
Assignable sq. footage:
NA
% of project complete:
62%

Project Funding

  • Vote approved General Obligation Bonds.

Progress of Major Construction Activities

  • Contractor has completed road concrete activities, open swales and installation of underground electrical infrastructure.
  • Sources of surface runoff water were identified to properly install the new storm drain system.
  • Possible impact to two (2) existing Jacaranda trees has been identified and eliminated.
  • Contractor has completed installation of western sections (towards Building 17) of the underground storm drain pipe.
  • Change Order No. 2 has been processed and payment made to contractor.

Key/Critical Issues Currently Pending

  • Assure project funds are extended beyond June 30, 2010 in order to allow full completion of the scope of work; particularly the Phase II road sections located within the College of Business site and at Lot H.
  • Complete the ADA walkways between Rose Garden, CBA and parking Lot H .
  • Complete fire lane road between CLA, new CBA building and lot H.

Upcoming Utility or Other Interruptions

  • NA at this time

Other Areas of Significance

  • NA at this time.