October 2008 Updates

Domestic Water Line Loop Extension Ph. II & IIA

New 10” pipe at the San jose Creek Channel. Click to Zoom. Construction in progress for trenching along the CTTI parking lot. Click to Zoom. 10” pipe being installed underground after  the San Jose Creek Channel crossing. Click to Zoom.
Backfill and pavement repair after pipe underground installation at the CTTI parking lot.. Click to Zoom. Inspection of trench in preparation for new fire hydrant. Click to Zoom.  New fire hydrant installed at the west end of South Campus Dr near the Agriscape/Farmstore. Click to Zoom.

About This Project

The project consists of a new 10” water line connecting the two existing ends of the campus’ domestic water service, including fire hydrants and flood control channel crossings.

Statistical Information

Construction start date:
July 2008
Expected completion date:
Nov 2008
Construction Cost:
$146,390
Total Project Cost: $342,000
Gross sq. footage:
N/A
Assignable sq. footage Addition:
N/A
% of project complete:
70%

Progress of Major Construction Activities

  • The 10” pipe has been installed along the Agriscapes field north of South Campus Drive, across the San Jose Creek channel, and along the Center for Training Technology & Incubation parking lot. Pipe Installation will continue to a final point of connection by Innovation Way.

Key/Critical Issues Currently Pending

  • Completion of this work will be phased and coordinated with the work (by others) of Innovation Village Phase 4 building site and structure.

Upcoming Utility or Other Interruptions

  • NA at this time.

Other Areas of Significance

  • NA at this time.