August 2008 Updates

Domestic Water Line Loop Extension Ph. II & IIA

A new Fire Hydrant is being installed at s/w corner of Temple Ave. and South Campus Drive. Click to Zoom. Construction in progress for the point of connection near Agriscapes/Farm Store. Click to Zoom. A section of the 10” pipe being installed at the San Jose Creek Channel. Click to Zoom.
Crews working on pipe connection at the San Jose Creek Channel crossing. Click to Zoom. View of completed pipe installation at channel crossing. Click to Zoom. Clearing and trenching for underground run of water line along the CTTI parking lot. Click to Zoom.

About This Project

The project consists of a new 10” water line connecting the two existing ends of the campus’ domestic water service, including fire hydrants and flood control channel crossings.

Statistical Information

Construction start date:
July 2008
Expected completion date:
Nov 2008
Construction Cost:
$146,390
Total Project Cost: $342,000
Gross sq. footage:
N/A
Assignable sq. footage Addition:
N/A
% of project complete:
50%

Progress of Major Construction Activities

  • The 10” pipe has been installed along the Agriscapes field north of South Campus Drive, across the San Jose Creek channel, and along the Center for Training Technology & Incubation parking lot. Pipe Installation will continue to a final point of connection by Innovation Way.

Key/Critical Issues Currently Pending

  • Completion of this work will be phased and coordinated with the work (by others) of Innovation Village Phase 4 building site and structure.

Upcoming Utility or Other Interruptions

  • NA at this time.

Other Areas of Significance

  • NA at this time.