March 2011 Updates

CTTI Parking Lot Modification & Innovation Way III

Asphalt paving the new parking lot near Building B (2/15/11). Click to Zoom. New storm drain line and catch basin at the end of Innovation Way near Temple Ave. (3/8/11). Click to Zoom. Grade work at new sidewalks near Build C & A (3/9/11).  Click to Zoom.
Concrete curbs and swell in the parking lot (3/15/11). Click to Zoom. Form for new concrete channel at Temple Ave. (3/15/11). Click to Zoom. New concrete sidewalk along Innovation Way to Temple Ave. (3/18/11). Click to Zoom.

About This Project

Modification of the existing parking lot for the CTTi Complex is necessary for he proper alignment of the final section of the ne Innovation Way road that will connect Kellogg Drive and Temple Avenue thru the center of the Innovation Village Research Park. The parking lot modifications will afford the opportunity for the Foundation to maintain the required number of spaces required by the Innovation Village Guidelines and maintain the lease ability of the complex. The work will include the removal of several ornamental Pear Trees which will be replanted along Kellogg Drive near the main campus, new planters with more native plantings similar to those planted at the Phase III and Phase IV sites, new high efficiency parking lot lights to match those at the other phases and new asphalt paving. The final section of the Innovation Way road will match the other sections now completed and ready for full use. In addition infrastructure will be continued to afford connectivity of the CTTi Complex with the main campus and future connection with other utilities from the Temple Avenue edge of the Village. The work is being completed by Sully-Miller Contracting Company of Brea, California.

Statistical Information

Construction start date:
Jan 2011
Expected completion date:
May 2011
Construction Cost:
$653,600
Total Project Cost: $850,000
Gross sq. footage:
NA
Assignable sq. footage:
NA
% of project complete:
85%

Project Funding

  • Cal Poly Pomona Foundation Inc. and EDA Grant

Progress of Major Construction Activities

  • Installation of concrete curbs, gutters and planters
  • Installation of parking lot and roadway base materials
  • Installation of trash enclosure
  • Installation of asphalt paving in Phase B area
  • Sealing and striping of Phase B area
  • Installation of irrigation lateral lines
  • Installation of parking lot light pole bases

Key/Critical Issues Currently Pending

  • NA at this time.

Upcoming Utility or Other Interruptions

  • NA at this time.

Other Areas of Significance

  • NA at this time.