October 2009 Updates

Bldg 8 Courtyard Concrete Patio

Installation of cut-to-size polystyrene foam on existing deck.    Used so less concrete is needed and to decrease total weight. Click to Zoom. All polystyrene block and rebar are in place just prior to the installation of the first/lightweight course of concrete.  Click to Zoom. Curing of first concrete pour.  Awaiting installation of waterproofing, reinforcement, and second/final concrete pour. Click to Zoom.
Ready for second/final concrete pour.  Waterproof membrane and related protection as well as rebar are in place. Click to Zoom. Shortly after the completion of the second/final concrete pour with primary rough finish only. Click to Zoom. Finished and curing final concrete with the layout for concrete joints in progress. Click to Zoom.

About This Project

The Building 8 Courtyard Concrete Deck project is located within the area between Buildings 3 and 8. The primary scope of work includes the construction of a concrete deck and related waterproofing and drainage.

The area of work was originally a planter which posed leaking and structural concerns for the mechanical room and related equipment located below [in the basement of Building 8].

Also included in this project is a seatwall which runs the perimeter of the deck. Patio furniture has been added to the area in order to increase use. Bicycle racks to be added as well. Funds and time permitting, additional land and hardscape work is expected to take place in the courtyard area adjacent to this new deck.

Statistical Information

Construction start date:
Aug 2009
Expected completion date:
Oct 2009
Construction Cost:
$100,000
Total Project Cost: $115,000
Gross sq. footage:
2,400
Assignable sq. footage addition:
NA
% of project complete:
95%

Project Funding

  • Building 3 Seismic Renovation Major Capital Project.

Progress of Major Construction Activities

  • Gravel and rocks to be installed.
  • Minor additional work items [i.e.: paint, other finishes, etc.] are pending.
  • Punch-List in progress.

Key/Critical Issues Currently Pending

  • NA at this time .

Upcoming Utility or Other Interruptions

  • NA at this time.

Other Areas of Significance

  • NA at this time.