About This Project

The scope of the Energy Efficiency HVAC Retrofit for Music Building 24 is to convert the constant volume, double duct, air handling unit, SA-3/RA-3, into a variable air volume (VAV), double duct air handling unit. With this approach, this air handling system will operate as a VAV system in that cold and hot air will not need to be mixed anymore, except when code minimum air flows are reached. Each zone will generally either call for heating or cooling, and the air flow to that zone will be varied to satisfy thermal need. The supply fan and return fan, provided with new variable frequency drives (VFDs) will slow down or speed up to deliver only the amount of air needed to satisfy load.

Statistical Information

Construction start date:
Nov 2008
Expected completion date:
Jan 2009
Construction Cost:
$525,000
Total Project Cost: $550,000
Gross sq. footage:
89,227
Assignable sq. footage addition:
47,225
% of project complete:
10%

Project Funding

  • Funding for this project is from the campuses Deferred Maintenance Budget, the S.C. Edison Energy Rebate Fund and the General Utility Budget Fund.

Progress of Major Construction Activities

  • All major activities complete.
  • Preliminary punch-list walk to take place within a week. Hallway ceiling panels to be reinstalled by the end of January.

Key/Critical Issues Currently Pending

  • Final testing and calibrating of the system.

Upcoming Utility or Other Interruptions

  • All significant shut-downs have been completed.

Other Areas of Significance

  • NA at this time.