- Planning
- Design & Construction
The scope of the Energy Efficiency HVAC Retrofit for Music Building 24 is to convert the constant volume, double duct, air handling unit, SA-3/RA-3, into a variable air volume (VAV), double duct air handling unit. With this approach, this air handling system will operate as a VAV system in that cold and hot air will not need to be mixed anymore, except when code minimum air flows are reached. Each zone will generally either call for heating or cooling, and the air flow to that zone will be varied to satisfy thermal need. The supply fan and return fan, provided with new variable frequency drives (VFDs) will slow down or speed up to deliver only the amount of air needed to satisfy load. Also being done is the replacement of the heating and cooling coils assemblies and related, as well as the addition of new economizers. Some light filtering window treated will be installed as well.
| Construction start date: | Oct 2008
|
| Expected completion date: | Feb 2009 |
| Construction Cost: | $550,000 |
| Total Project Cost: | $575,000 |
| Gross sq. footage: | 89,227 |
| Assignable sq. footage addition: | 47,225 |
| % of project complete: | 3% |