Bldg. 24 & 25 HVAC Retrofit Upgrade

Bldg. 24 Old mixing damper. Click to Zoom. Bldg. 24 Old mixing damper. Click to Zoom. Bldg. 24 Above ceiling showing construction. Click to Zoom.
Bldg. 24 Ducting through concrete wall. Click to Zoom. Bldg. 24 Roof Access Panel. Click to Zoom. Bldg. 24 Roof Access Panel. Click to Zoom.

About This Project

The scope of the Energy Efficiency HVAC Retrofit for Music Building 24 is to convert the constant volume, double duct, air handling unit, SA-3/RA-3, into a variable air volume (VAV), double duct air handling unit. With this approach, this air handling system will operate as a VAV system in that cold and hot air will not need to be mixed anymore, except when code minimum air flows are reached. Each zone will generally either call for heating or cooling, and the air flow to that zone will be varied to satisfy thermal need. The supply fan and return fan, provided with new variable frequency drives (VFDs) will slow down or speed up to deliver only the amount of air needed to satisfy load. Also being done is the replacement of the heating and cooling coils assemblies and related, as well as the addition of new economizers. Some light filtering window treated will be installed as well.

Statistical Information

Construction start date:
Oct 2008
Expected completion date:
Feb 2009
Construction Cost:
$550,000
Total Project Cost: $575,000
Gross sq. footage:
89,227
Assignable sq. footage addition:
47,225
% of project complete:
3%

Progress of Major Construction Activities

  • Site preparations are underway at Building 24.

Key/Critical Issues Currently Pending

  • Submittals are in progress.

Upcoming Utility or Other Interruptions

  • Minor HVAC systems interruptions will be on going throughout the project. Major HVAC systems shut-downs are being scheduled to take place during the next quarter break / during the holidays.

Other Areas of Significance

  • NA at this time.