October 2010 Updates

Alamitos Hall - Bldg. 22 ADA Restroom Upgrade

Building 22 typical exterior brick façade along University Dr.  Click to Zoom. Exterior parking lot at Bldg. 22 is comprehensively upgraded to meet accessibility  requirements.  Click to Zoom. Repair of damaged unsafe sidewalks and stairs at Building 22. Click to Zoom.
Safety fixtures and new water resistant ceiling tiles.  Click to Zoom. New interior plumbing infrastructure, tile  finishing and fixtures were added at all three floors.  Click to zoom. View of new shower room improvements. Swanstone walls, waterproofed ceilings, and individual floor drains were included. Click to Zoom.

About This Project

Alamitos Hall Building 22 is a student residential building erected in 1961 on a total area of 37,426 SF. The building is located at University Drive and is widely identified by its red brick exterior facade. The scope of work for this project includes a full ADA renovation of all eight restrooms and shower rooms; a total of approximately 2,700 SF. It includes installing new electrical, mechanical, plumbing and fire safety systems. Environmental abatement work will also be carried out at these facilities.

This $1.55M project will provide fresh ventilation and A/C systems in restrooms, as well as the complete finishing systems, including ceramic tiles and waterproof ceiling tiles. The project was started on June 14, 2010 and construction at the dormitories will be completed by September 15, 2010. Construction of additional exterior walkways and stairs will be implemented and completed during the same timeframe.

Statistical Information

Construction start date:
June 14, 2010
Expected completion date:
Sept 2010
Construction Cost:
$1,225,000
Total Project Cost: $1,550,000
Gross sq. footage:
10,000
Assignable sq. footage addition:
2,700
% of project complete:
100%

Project Funding

  • University Housing Services

Progress of Major Construction Activities

  • The project is completed within the expected schedule. The Fire Marshal has approved on September 2, 2010 the new fire alarm system and related safety improvements.
  • Fresh ventilation has been installed at all eight restrooms. New lighting fixtures using motion sensors will improve energy consumption at the building.
  • Exterior sidewalks, ramps and the new parking lot are currently completed. New ADA concrete surfaces were poured and placed on approximately 7500 SQF of the building surroundings.
  • 10,000 SQF of new ceramic tile floors and walls are now completed replacing old finishing materials. Lobby upgrades including two visitor restrooms at first floor and A/C at TV room were completed.
  • The air balance report containing the HVAC system efficiencies and capacities was delivered.
  • Notice of Completion was successfully recorded.

Key/Critical Issues Currently Pending

  • Process final change order payment and retention payment 30 days after Notice of completion.
  • Finalize project documentation and the project performance report.

Upcoming Utility or Other Interruptions

  • NA at this time.

Other Areas of Significance

  • NA at this time.