Montecito Hall - Bldg. 21 ADA Restroom Upgrade

Building 20 typical exterior brick façade view along University Dr. Click to Zoom. Temporary pathways have been put in place at University Drive to allow for safety construction of new ADA sidewalks to Bldg. 21. Click to Zoom. View of Montecito Hall Bldg. 21 parking lot improvements. A total of 5 parking spots are enhanced for ADA and students use.  Click to Zoom.
ADA sidewalks at University Drive. Click to Zoom. Finish surfaces. Waste and water systems were installed as part of a comprehensive renewal of the building’s mechanical systems. Click to Zoom. New “Swanstone” shower pans and walls were  renewed at all shower locations. Also view of waterproofed ceilings. Click to Zoom.

About This Project

Montecito Hall Building 21. is a student residential building erected in 1961 on a total SF area of 37,426 SF. The building is located at University Dr. and is widely identified by its red brick exterior facade. The scope of work of this project includes a full ADA renovation of all 8 restrooms and shower rooms on approximately 2,700 square feet. It includes installing completely new electrical, mechanical, plumbing and fire safety systems. Environmental abatement work will also be carried out at these facilities.

This $1.52 million project will provide fresh ventilation and A/C systems in restrooms, as well as the complete finishing systems, including ceramic tiles and waterproof ceiling tiles. The project will be implemented beginning June 15th during the Summer Quarter vacation period. Project will be completed by September 10th 2009.

In addition, the ground floor will require additional work to remove access barriers, provide access signage, and provide fully accessible restrooms for dormitories tenants.

Statistical Information

Construction start date:
June 15, 2009
Expected completion date:
Sept 2009
Construction Cost:
$1,150,000
Total Project Cost: $1,500,000
Gross sq. footage:
3,700
Assignable sq. footage addition:
2,700
% of project complete:
100%

Project Funding

  • Funding for this project is from University Housing a Department of Student Affairs Division utilizing existing reserve funds.

Progress of Major Construction Activities

  • HVAC equipments installation at the lobby and restrooms is finalized.
  • New concrete sidewalks at exterior building locations are completed.
  • Parking lot activities are completed.
  • Ceramic tile installation and all finishing work has been completed.

Key/Critical Issues Currently Pending

  • NA at this time.

Upcoming Utility or Other Interruptions

  • NA at this time.

Other Areas of Significance

  • NA at this time.