Olive Lane Restoration

olive lane drawing

The project consists of the demolition and reconfiguation of Olive Lane from the west side of the CLA Building south to the existing gate at the entry from parking lot 'D'. The existing road will be reconfigured to provide a pedestrian designated walkway with improved lighting and landscaping features. In addition, this project will include a renovation of the existing walkway on the south side of the CLA Building. This includes a wider walkway lined with trees, new lighting and additional landscape features. Thie project will be done in phases to minimize the impact to campus accessibility to all of these areas.

olive lane exterior olive lane exterior olive lane exterior olive lane exterior olive lane exterior olive lane exterior
Project Statistics
Construction start date: April 14, 2003
Expected completion date: September 22, 2003
Construction Cost: $858,000
Gross square footage: n/a
Assignable sq. footage: n/a
Percentage of project complete: 100%