The overall site is an approximately 65 acre parcel set aside by the University to develop in a joint private/public partnership to create facilities that will enable students and faculty to work or participate in innovative product or manufacturing development. Approximately 4 acres have already been developed. The Project, designated as Phase 1, will include the construction of a vehicular bridge over the existing San Jose Flood Control Channel and an extension of the campus' Kellogg Drive with perimeter landscaped setbacks and parkways, new signalization at Valley Blvd., and signal modifications at the intersections of Kellogg Drive and South Campus Drive, and wet and dry utilities.
Modifications to the intersection of Kellogg Drive and South Campus Drive include the following:
You may view the Construction Schedule Narrative for this project.
| Project Statistics | |
| Construction start date: | May 10, 2004 |
| Expected completion date: | January 18, 2005 |
| Construction Cost: | $2,991,119 |
| Gross square footage: | n/a |
| Assignable sq. footage: | n/a |
| Percentage of project complete: | 100% |