Domestic Domestic Water Line Loop Extension Ph. II & IIA

Trenching for the new water pipe along Agriscapes field. Click to Zoom. Contractor is connecting sections of the 10” pipe. Click to Zoom. A future branch connection on the main run of pipe. Click to Zoom. A section of the new 10” pipe is being lowered into the 5 ft  deep trench. Click to Zoom.

Photo of Javier Montoya
Javier Montoya
Project Manager

The project consists of a new 10” water line connecting the two existing ends of the campus’ domestic water service, including fire hydrants and flood control channel crossings.

Questions or comments may be directed to the Project Manager, Javier Montoya at jmontoya1@csupomona.edu

Construction start date: July 2008
Expected completion date: Nov 2008
Construction Cost: $146,390
Total Project Cost: $342,000
Gross square footage: N/A