Ultrasupercritical Steam Turbines:
Next-Generation Design and Materials
Generating plants fired with fossil
fuels—coal, natural gas, and oil—supply about 70% of the world's
demand for electricity. The need to further reduce environmental
emissions from such plants is driving growing interest in
higher-efficiency fossil fuel units, which produce proportionately
less pollution per megawatthour. The most direct route to increasing
efficiency is the evolutionary advance of increasing steam
temperatures and pressures.
The ultrasupercritical fossil power plant is one option for
high-efficiency, low-emissions electricity generation. Based on
significantly higher steam temperatures and pressures beyond those
traditionally employed for supercritical plants, the operating
conditions of ultrasupercritical units put new demands on steam
turbine design, particularly where the business climate demands
flexible, reliable cycling operation of generating units.
Ultrasupercritical plants have been under development for some
time in Japan; more recently, they have become a focus of
development work in Europe, with increasing interest among the U.S.
power industry as well. Ultrasupercritical units pose particular
challenges for maintaining equipment reliability and flexible
operation at more-advanced steam conditions.
A new EPRI report (1006844) reviews the operating demands on
ultrasupercritical steam turbines from both a design and a materials
perspective. Produced by Tony Armor, technical executive for EPRI's
Global Coal Initiative, the report provides a worldwide survey of
the current performance of existing supercriticals and an assessment
of the technologies necessary for making new ultrasupercritical
units successful. Armor drew extensively from the experience and
insights of a network of consultants and contractors that
participated in EPRI-led advanced supercritical design work in the
1980s.
Preparing for the next
generation Dramatic improvements in materials technology for
boilers and steam turbines since the early 1980s, plus improved
understanding of power plant water chemistry, have led to increasing
numbers of new fossil power plants around the world that employ
supercritical steam cycles. Many site-specific factors come into
play in the selection of a supercritical versus a subcritical cycle,
including the configured cycles' comparative expected reliability
and availability.
"The reliability and availability of more recent supercritical
units have matched or exceeded subcritical units in baseload
operation, after early problems in first- and second-generation
supercritical boilers and steam turbines were overcome," notes
Armor.
The limited number of U.S. fossil plants built with subcritical
cycles in the past 20 years has been mainly a result of relatively
low fuel costs that eliminated justification for somewhat higher
capital costs of higher-efficiency plants. But in some international
markets where fuel cost is a higher fraction of the total cost,
higher-efficiency cycles produce a lower cost of electricity with
lower emissions, compared with a subcritical unit. This is
particularly pertinent for an anticipated future in which emissions
of carbon dioxide are constrained, for example, by international
agreement.
More than 170 supercritical units are operating in the United
States, about 60 in Japan, and about 60 in Europe. The greatest
concentration of supercriticals is in Russia and in the former
Eastern bloc countries, where more than 230 are in service.
According to Armor, "The world is now preparing for a major step
forward in steam temperature and pressure for a new generation of
ultrasupercritical units." The U.S. Department of Energy is already
involved in preparing advanced boiler materials and designs for
advanced supercriticals, he notes. "Attention to better design and
materials concepts for the ultrasupercritical steam turbine is now
needed," adds Armor.
Materials stressed by
cycling Cycling and startup needs for steam turbines to
operate in a volatile electricity market puts an emphasis on the
turbine's ability to handle fast loading and frequent load swings
without significant loss of material life for critical components.
Rotor cooling, turbine by-pass systems, on-line monitoring, stronger
materials, and better control systems will all likely be needed.
"This is the crux of the challenge for ultrasupercriticals in the
United States," says Armor. "We need these plants to have good
cycling capability, but the materials used for ultrasupercriticals
make them hard to cycle, and more prone to creep and fatigue damage.
Ultrasupercriticals are particularly challenging units to cycle, and
doing so calls for very careful design. Most ultrasupercriticals in
Europe will be operated at baseload capacity, rather than cycled,
for this reason."
Insights from analysis Based on
his review of current designs and performance of supercritical steam
turbines operating in the United States, Europe, Russia, and Japan,
EPRI's Armor identified additional, remaining design issues to be
resolved for steam turbines and the need for stronger materials for
turbine components. Insights include:
- Better efficiencies and lower heat rates of ultrasupercritical
units could demand optimized thermodynamic cycles (such as the
addition of topping cycles, for example), improved turbine
exhaust-flow schemes, and advanced feedwater heaters and
condensers.
- The need for high reliability and availability translates to
requirements for stronger materials for rotor forgings, casings,
steamlines, and valves. Specific methods to avoid hard particle
erosion and operational losses in thermodynamic performance will
be needed as well.
- Ferritic materials will be replaced by nickel-based
superalloys as steam conditions are increased. This changeover
point is an issue still to be resolved.
- Understanding maintenance needs of the ultrasupercritical
steam turbine and its auxiliary systems is essential for
long-term, reliable operation.
An ultrasupercritical test
facility, retrofitted to an existing unit, is suggested as one
option for testing new materials and designs. Originally proposed as
part of EPRI-led advanced design work in the mid-1980s, the facility
would have an advanced turbine-generator and new steam generator for
testing turbine rotors, bolting, and valves as well as rotor
cooling, seal development, very high pressure feed pump seals, and
advanced feedwater heaters.
Russian intrigue The greatest
concentration of installed supercritical units is in the countries
of the former Soviet Union, where 232 units are in operation,
providing about 40% of all electricity needs in those countries. The
units are designed at specific sizes, from 300 MW to 1200 MW.
Technology for Russian machines evolved for more than 70 years
largely independently of the rest of the developed world, and thus
offers some intriguing possibilities for plant improvements, notes
Armor. Boiler modifications for combustion of low-rank and high-ash
coals, turbine designs with unusual back-end configurations,
district heating applications of supercriticals, and water chemistry
approaches using oxygenated treatments were all reviewed in the
United States following a 1989 visit by EPRI staff to its
then-Soviet counterparts in the power industry. Such ideas have been
subsequently studied and, in some cases, deployed in the United
States.
Unusual features of Russian supercritical designs, in some cases
unique in the world, include:
- Titanium blades for the last stages of 1200-MW low pressure
rotors
- Direct contact feedwater heaters to improve heat rate
- Baumann exhausts with divided LP steam flow to improve
efficiency
- High pressure and intermediate pressure cylinder flanges with
heating devices to minimize start-up times
- Side-by-side condensers to lower steam velocity and increase
condenser pressure
- Supercritical units adapted for cogeneration
- Annular boilers and spiral fireball designs for low-rank
coals.
European initiatives Advanced
supercritical plants are currently being pursued by the European
Commission, under the THERMIE project. Beginning in 1998, a group of
40 European companies began work to provide the technical support
for development of an ultrasupercritical plant (steam conditions of
35 bar, 700C/720C/720C), with an overall plant efficiency of 55%
(lower heating value). This plant is aimed at larger unit sizes and
essentially baseload operation, curtailing the immediate need for
special designs for rapid cycling.
Still, it is likely that optimized start-up systems and other
cycling-focused approaches will be needed for profitable operation
in a deregulated market, in order to take advantage of volatile
electricity prices. Such innovations as a welded turbine rotor,
comprised of small forgings welded together to reduce total mass and
thermal stresses for more-flexible cycling operation, are likely to
be deployed in the THERMIE ultrasupercritical demonstration plant.
Implied in the goals adopted for the THERMIE project is the
ultimate application of nickel-based superalloys to replace ferritic
alloys for high temperature components. These superalloys
traditionally have been used for gas turbines, but at significantly
smaller sizes than for steam turbines. The THERMIE project schedule
lays out a substantial plan for development work leading to startup
of the demonstration plant in 2012.
EPRI perspective
"Reliable
application of ultrasupercritical steam turbine designs in new
generating plants is a worldwide issue and will benefit from
worldwide collaboration," emphasizes Armor. This applies to design
issues as well as material issues, he adds in his report.
"EPRI will seek the best technology to address concerns that are
raised in the report and welcomes the opportunity to work with
government, equipment manufacturers, generating companies, and
engineering consultants to prepare and execute a research and
development plan to solve them," Armor adds.
EPRI members and target funders of the Global Coal Initiative may
order Ultrasupercritical Steam Turbines: Design and Materials
Issues for the Next Generation (1006844) by calling EPRI
Customer Service, 800-313-3774, or download a copy by pressing here.
Photos: Top: This 700-MW
Toshiba turbine at the Kawagoe plant in Chubu prefecture, Japan, was
one of the first supercritical units to use superclean low pressure
turbine steels, originally developed by EPRI.
Second from
top: The gas-fired Moss Landing plant of Duke Energy North
America includes two large supercritical units that have been
modified to operate under low-load conditions. This enables the
units to operate more flexibly in increasingly volatile electricity
markets.
For more information, contact Tony Armor, mailto:%20aarmor@epri.com,
650-855-2961.
|