Cal Poly Pomona Logo

Cal Poly Pomona Concrete Canoe

HomeThe TeamScheduleDocumentsMediaLinks

Reading Materials
             
  10/25/2007   Power Tool List   A list of power tools that may be employed in the Canoe Room.  Students must go over the instructions before using the tools.  
             
  10/25/2007   Safety Guidelines   Safety procedures and guidelines to be adhered to when working in the Canoe Room.   
             
  09/11/2007   Significant Changes   Significant changes on rules and regulations of National Concrete Canoe Competition 2007-2008  
             
  09/11/2007   R & R 2008   National Concrete Canoe Competition Rules and Regulations 2007-2008.  A must-read for all Concrete Canoe Team members.  
             
  08/10/2007   The Wedge   Design paper from 2006-2007  
             
  08/10/2007   Antez   Design paper from 2005-2006  
             
  08/10/2007   Limelite   Design paper from 2004-2005  
             
  08/10/2007   Kellogg's Grreatest   Design paper from 2003-2004  
             
  08/07/2007   CE 499 Class Policies   For those of who are interested in taking Concrete Canoe as a technical elective class, please read and acknowledge the policies.  The class fulfills two (2) tech elective units per quarter for a period of two (2) quarters.  Prerequisite for class: junior or senior status, captains' and advisor's approvals.  

 

Forms
             
  09/14/2007   Reimbursement Form   This reimbursement form is for Concrete Canoe Team only.  Students requesting for reimbursement are required to obtain approvals from Department Chair (Professor Coduto) and Concrete Canoe Advisor (Professor Kitch).  Forms can be filled out either manually or electronically, and submitted in hard copy, attached with relevant proof of purchase (receipts), to Administrative Support Coordinator Angela Hicks.  

© Cal Poly Pomona Concrete Canoe 2007-2008

[Home] - [The Team] - [Project Schedule] - [Documents] - [Media Gallery] - [External Links]